Samar News.com Mobile Website

Drainage improvement in Barangay Tarabucan completed

Barangay Tarabucan drainage system

By GISSELLE G. PARUNGAO
September 21, 2021

CALBAYOG CITY – A P49.09-million drainage with flood control structure is constructed and upgraded in Barangay Tarabucan, Calbayog City has been completed, said Samar First District Engineering Office.

The structure has three-barrel reinforced concrete box culvert with a height of three (3) meters and length of 22 meters in replacement to the old reinforced concrete pipe culvert to make it sturdier and can accommodate large volume of water to pass through.

Part of the scope of work is a flood control structure which spans 227.60 meters on the upstream with a height of five (5) meters. Likewise, same structure is built with a length of 111.69 meters and a height of 5.4 meters on the downstream part of the area.

Surge of water from the nearby mountains is one of the causes of flooding in the said barangay during heavy rains. This structure will help save lives and properties as well as lessen the dangers of extreme floods.

More News:
On DepEd's claim of 300k+ laptops, teachers ask: Nasaan?
PH leads international standardization of laminated bamboo strips for indoor furniture use
Independent int’l probe on human rights violations in PH concludes with damning evidence vs. Duterte
Pull-out of CARHRIHL, peace talks documents from state university library sets dangerous pretext
Filipino product offerings in Woolworths expands to 262 stores despite the pandemic
© Copyright 2013-2021 Samar News.com Mobile